RFQ Preparation Checklist
- Drawing/model package
- Material and tolerance notes
- Quantity and delivery deadline
- Destination and documents
- Application conditions and critical-to-quality dimensions
- Packing, labeling, and certificate expectations
A practical RFQ-to-delivery process for custom graphite parts, including DFM review, material confirmation, production, inspection, packing, and export coordination.
Complete RFQs are easier to review within 1-2 business days when drawings, graphite grade, quantity, and destination are included.

| Program Metric | Typical Range | Procurement Value |
|---|---|---|
| RFQ clarity | Drawing + material + quantity + destination | Complete RFQs shorten quotation time and reduce graphite-specific production risk. |
| Production release gate | Revision, material, tolerance, inspection, and packing confirmed | A release gate prevents machining from starting before ambiguous graphite risks are closed. |
| Pre-shipment evidence | Photos, CTQ checks, labels, packing, and document review | Evidence before shipment helps international buyers catch issues before parts leave the factory. |


Send drawings, material grade, quantity, application, deadline, and destination. If the material is unknown, provide operating conditions.
A budgetary review may be possible, but production release needs enough data to confirm material, tolerances, inspection, and packing risk.
The normal sequence is drawing/material confirmation, production release, machining, inspection, packing review, document preparation, and shipment coordination.
Inquiry Email
Complete RFQs are easier to review within 1-2 business days when drawings, grade, quantity, and destination are included.
WhatsApp Alignment
+8618857971991
Use WhatsApp for quick alignment; send drawings by email for traceable review.