Home / Supplier RFQ guide

Carbon Graphite Bushings Supplier & RFQ Guide

Build an RFQ brief, screen thermal-fit assumptions, and check supplier evidence before ordering.

Published · Reviewed · By Custom Graphite Parts

Build an RFQ brief

Six required inputs. Optional fit screening uses your dimensions and grade values.

Bushing sourcing requirements
Review result
Enable JavaScript for the checker, or request a manual drawing review below.
Optional thermal fit screening — sleeve / flanged only

All five values are needed. Equal, uniform service temperature is assumed for housing and bushing; CTE is constant. This free-expansion estimate omits elastic contact stress, bore closure, shaft clearance and thermal gradients. It gives no shrink-fitting temperature or fit approval.

User-supplied fit assumptions

Select a sleeve or flanged geometry to use these fields. Split bushings and washers need a different assembly model.

Enter valid required values to prepare a briefCopy the brief into the contact form if no email app is configured. Attachments must be added manually.

1. Four decisions before supplier shortlisting

Specify a named grade

Mechanical carbon grades differ. Ask for the impregnation, data sheet and lot identity instead of buying by the word “graphite”.

Evidence: MERSEN

Separate tolerance from clearance

A bore tolerance class must be read with nominal size. Request shaft limits and the assembled acceptance condition.

Evidence: ISO

Review operating retention

Mounting method and service temperature matter. The free-expansion screen helps frame a review; it cannot approve the contact stresses.

Evidence: MORGAN

Verify water-contact evidence

EPA water limits and NSF health-effects scope answer different questions. Ask for the applicable product/formulation evidence.

Evidence: EPANSF

2. Material family: what the quote must identify

This is a procurement comparison, not a grade approval. Mersen provides individual grade references; the limits of another producer’s material cannot be transferred to a proposed part.

Material questions for written supplier confirmation — scroll horizontally on narrow screens.
Candidate familyPotential reason to investigateEvidence / unresolved limit
Resin-impregnated carbonLiquid service where permeability mattersExact resin, cure, fluid compatibility, temperature and pressure limits; unknown until documented
Metal-impregnated carbonMechanical or thermal duty requiring a different gradeMetal identity, corrosion and contact restrictions; no blanket potable-water approval
PTFE-containing gradeApplication where a fluoropolymer formulation is proposedFinished grade properties and load/temperature limits; chemical resistance is not universal
Unimpregnated carbon / electrographiteDuty where porosity or organic content must be reviewedPermeability, oxidation and wear data in the intended atmosphere
Alternative bearing materialShock, slurry, standard stock size or cost may dominateCompare bronze, polymer or ceramic on the actual duty; obtain equivalent test evidence
Evidence: MERSENNSF

3. Drawings, tolerances and assembled acceptance

Sleeve section: outside diameter, bore and length are separate drawing requirements; assembled clearance needs the shaft size.Drawing: ID / OD / length / datumsBushing wallShaft + running gapLengthODID

Do not translate H7 into a universal numerical tolerance or a running clearance. Select the nominal size and class from ISO 286-2, then agree shaft limits and the assembly condition separately.

Drawing review checklist — proposed acceptance items — scroll horizontally on narrow screens.
FeatureBuyer inputSupplier response needed
Bore ID and shaftNominal sizes, limit deviations, intended running clearanceFree-state and assembled bore limits; no fixed bore compensation inferred
OD and housingBoth component limits, housing wall and mounting methodMinimum/maximum interference and contact-stress review
Length and flangeLength, perpendicularity, root detail and axial loadsMachinability deviations and datum definition
Thin or split wallsMinimum wall, split line and clamped inspection stateSupport/fixture proposal and first-article roundness evidence
Surface and edgesRoughness metric, edge breaks, chip acceptanceFinish measurement method, visual criteria and handling plan
Evidence: ISO

4. Reproduce the thermal screening result

Cold interference minus differential free expansion equals illustrated residual interference. Contact stress and assembled bore closure are not calculated.Cold diametral interference (µm)Subtract: OD × CTE gap × dT / 1000Illustrated residual (µm)Free expansion only — verify assembly separately

The tool estimates differential free expansion: loss (µm) = OD (mm) × (housing CTE − grade CTE in ×10⁻⁶/K) × (service temperature − reference temperature) ÷ 1000. Residual = cold diametral interference − loss.

The table below is a synthetic sensitivity example: OD 30 mm; cold interference 25 µm; reference 20°C; service 160°C; graphite CTE 3.5 ×10⁻⁶/K. Housing CTE values are illustrative inputs, not certified alloy properties. Both parts are assumed to reach the same uniform temperature.

Illustrative thermal sensitivity — same formula as the tool — scroll horizontally on narrow screens.
Assumed housing CTE (×10⁻⁶/K)Interference loss (µm)Residual (µm)Interpretation
11.533.60-8.60Cold interference exhausted in this model; request redesign
1652.50-27.50Cold interference exhausted in this model; request redesign
8.621.423.58Residual positive; contact stress and tolerances still unknown

Limit: this is not an elastic Lamé solution. Bore close-in, stiffness, anisotropy, temperature gradients, creep, shaft growth and retention loads are omitted. A higher installation temperature alone does not change the cold interference or guarantee operating retention. Split bushings and washers are excluded.

Evidence: MORGAN
Carbon graphite bushings supplier checker showing the illustrative 33.60 µm interference loss and -8.60 µm residual
Actual checker execution captured October 22, 2026. Load example to reproduce: 30 mm OD, 25 µm cold interference, 20°C reference, 160°C service, housing/grade CTE 11.5/3.5 ×10⁻⁶/K. Software evidence only; this is not a physical bushing test or a customer result. Site navigation and the floating contact control are hidden for the capture.

5. Ask for an inspection plan you can accept

Inspection evidence — agree scope before ordering — scroll horizontally on narrow screens.
QuestionRecord to requestDecision limit
Which material was used?Named grade, impregnation and raw-material lot recordA generic carbon certificate does not establish finished duty suitability
How is the bore measured?Calibrated method, masters, uncertainty and free/assembled conditionAir gaging suitability depends on surface, porosity and tolerance
What is first-article coverage?Ballooned drawing and agreed feature reportFAI does not imply every production piece is fully inspected
How are surfaces handled?Chip criteria, cleaning, fixture/support and packing photosApprove objective limits rather than “zero defects” wording
How is wear qualified?Test geometry, load, speed, medium, duration and wear measurementsASTM D3702 laboratory results alone do not reproduce your pump duty
Evidence: ASTM

These are recommended RFQ requirements. No ISO 9001 certification, specific metrology brand, 100% CMM coverage or included test report is asserted without order-specific documentation.

6. Qualify the supplier in five review gates

Qualification sequence: drawing review, grade evidence, first article, duty trial, then batch release. A quotation is not a duty approval.DrawingGrade evidenceFirst articleDuty trialBatch releaseEvidence at each gate; no automatic approval
  1. Resolve drawing revision, operating inputs and exceptions.
  2. Review grade identity, compatibility and required certification scope.
  3. Approve the first article against agreed dimensional and visual criteria.
  4. Run an application trial with predefined wear, temperature and retention acceptance limits.
  5. Release the batch only after records, change control and packing requirements are accepted.

This is a recommended purchasing workflow, not a claim that a named supplier has completed these gates.

Review drawing & evidence

7. Misuse, cost and application mismatch risks

Risk-to-action matrix — sourcing recommendations — scroll horizontally on narrow screens.
RiskWhat can go wrongMinimum mitigation / alternative
Fit estimate used as approvalPositive residual hides excessive cold compression or bore closureRequest tolerance/contact analysis and assembled measurements
Grade selected from temperature aloneFluid, vacuum, oxidation or start/stop behavior differs from the rating basisAsk for written duty evidence; trial a different grade or bearing family
Unknown counterface or slurryCorrosion, coating loss or abrasive solids dominate wearRecord shaft condition and solids; review the bearing pair together
Quotation excludes qualificationLow unit price hides inspection, trial and replacement costsObtain itemized scope and price the qualification plan
Part certification confused with water complianceWrong formulation or contact conditions usedVerify product listing and local acceptance with the buyer’s compliance team
Evidence: NSFMORGAN

8. Compare total cost using buyer data

Use the same drawing, quantity, inspection scope and duty trial for each quote. Supplier categories do not prove quality: a distributor may have stock and traceability; a specialist shop may suit custom work; either needs evidence.

Cost worksheet — values unknown until quoted or measured — scroll horizontally on narrow screens.
Cost inputCollect fromComparison rule
Piece price + setup + material minimumItemized quotationNormalize to accepted quantity and drawing revision
Qualification and inspectionFAI, duty-trial and documentation proposalInclude agreed external testing and rejected-trial cost
Packing + freight + dutiesDated forwarder / broker quoteUse the same destination and Incoterm
Service replacements + downtimeBuyer field records or explicit scenario assumptionLabel estimates; do not infer zero failures or a savings percentage

9. Three hypothetical sourcing exercises

Illustrations only. These are not customer case histories or measured operating outcomes.

A. Hot liquid pump fit

Premise: the tool example uses 30 mm OD, 25 µm interference and a 140 K rise.

Process: compare free-expansion loss of 33.60 µm with cold interference.

Result: illustrated residual −8.60 µm. Request a retention and stress review; no assembly temperature is prescribed.

B. Drinking-water inquiry

Premise: buyer knows dimensions but the formulation and applicable listing are unknown.

Process: mark service “Drinking water” and request the exact contact-condition evidence.

Result: compliance remains unresolved. Do not release the material based on “pure graphite” or a generic resin description.

Evidence: EPANSF

C. Dry furnace replacement

Premise: maximum temperature is known, but gas pressure and wear history are missing.

Process: collect atmosphere, humidity, load, RPM and start/stop cycle; ask for matching wear evidence.

Result: request a trial plan or an alternative bearing material. No service-life prediction follows from this exercise.

10. Packing, delivery and customs questions

Packaging concept: separated bushings in foam pockets inside a supported box. Confirm raw wood treatment only when applicable.Support edges; prevent part-to-part contactBox + separate foam pocketsPacking concept, not a shipment certificate
Shipment requirements — confirm in the quotation — scroll horizontally on narrow screens.
ItemAsk the supplier / forwarderBoundary
Brittle edge protectionSeparate pockets, supported edges, agreed handling and chip criteriaApprove packing proposal; no transit damage guarantee inferred
Wood packagingIdentify raw wood versus processed wood and required treatment / marksISPM 15 scope applies to raw wood; plywood is excluded
Delivery scheduleGrade availability, machining, inspection, dispatch and dated lane estimateNo fixed lead time or MOQ is established by this page
CustomsDestination broker classification based on composition and actual useNo universal HS/HTS code is assigned by the tool
Order documentsInvoice, packing list, agreed conformance and material recordsConfirm required documents before order release
Evidence: IPPC

11. Evidence register and known limitations

Public source pages reviewed October 22, 2026. Standard abstracts and manufacturer publications are identified below; no access to full paid standards, current supplier certificates, private test records or customer results is claimed.

Mersen — Mechanical Carbon-Graphite

Mechanical-grade families and individual grade data downloads.

Limit: Manufacturer reference; it does not certify our material or your finished assembly.

Morgan — Carbon bearings application data

Sections 8 and 10: mounting methods, operating retention and shaft pairing.

Limit: Manufacturer guidance; assembly dimensions, loads and grade properties still need review. No universal 45 HRC threshold is established.

ISO 286-2:2010 — Tolerance classes

Hole and shaft tolerance deviations by nominal size.

Limit: Public abstract verified; full numerical tables are not reproduced. A bore class alone does not define running clearance.

NSF — Drinking water component health effects

Explains NSF/ANSI 61 health-effects scope for water-contact products and materials.

Limit: The educational article links an older edition; confirm the applicable edition and exact product listing. Health-effects assessment does not prove mechanical performance.

IPPC — ISPM 15 wood packaging

Raw-wood packaging phytosanitary measures; processed wood such as plywood is excluded.

Limit: Does not certify graphite parts, guarantee clearance or establish transport damage resistance.

ASTM D3702-24 — Thrust-washer wear testing

Public description of a laboratory wear/friction test method.

Limit: Full paid standard not reproduced. Laboratory geometry and conditions must be compared with the actual bushing duty.

Known: the displayed formula, user inputs, source scope and worksheet method. Unknown: offered grade, dimensional capability, certification, MOQ, lead time, freight, price and operating life until supported by a written quotation and qualification evidence.

12. Supplier RFQ questions

Quotation

What should I send to a carbon graphite bushings supplier?

Send the dimensioned PDF and, if available, a STEP model, plus named grade or service conditions, load, shaft RPM, temperature, counterface, quantity and destination. Mark missing data as unknown rather than guessing.

Can I request a prototype without a production order?

State your trial quantity and acceptance plan in the RFQ. Prototype availability, MOQ, stock grade and delivery date must be confirmed in the supplier quotation.

Does the checker provide a price or delivery commitment?

No. Its output is a buyer brief and a list of unresolved checks. Material availability, machining, inspection, certification and freight need an itemized quote.

Fit and inspection

Does H7 mean a fixed clearance or ±0.012 mm?

No. ISO 286-2 tolerance values depend on nominal size. Running clearance also needs the shaft limits and assembled bore condition; specify all of these on the drawing.

Will shrink-fitting prevent loosening at operating temperature?

Heating can ease installation. Operating retention still depends on the cold interference, temperature field, grade properties, geometry and tolerances; changing only the installation temperature does not change the cold fit.

Can wall ratio alone predict bore close-in?

No validated universal transfer factor is used here. Request an elastic contact analysis using both parts and grade properties, then verify bore dimensions after assembly.

Is air gaging always the correct inspection method?

Agree a calibrated method and measurement uncertainty for the actual surface and tolerance. Air gaging needs suitable masters and evaluation of porosity and surface finish; it is not a replacement for a complete datum and sampling plan.

Materials

Is 45 HRC a universal minimum shaft hardness?

No. Select the pairing using alloy, finish, fluid, corrosion, load, speed and wear evidence. The Morgan reference discusses several shaft materials and favors harder, well-finished surfaces without establishing that universal cutoff.

Are resin, PTFE or antimony temperatures universal limits?

No. Obtain the named grade data sheet and limits for continuous and transient operation in the actual atmosphere or fluid. A limit for a different grade or product cannot approve a bushing.

Are antimony-impregnated bushings automatically banned in drinking water?

The EPA lists a 0.006 mg/L antimony limit in drinking water; that does not establish a blanket component ban. Verify the exact water-contact formulation, applicable product listing and permitted conditions. No potable-water approval is asserted here.

Can I select a vacuum bushing from temperature resistance alone?

No. Ask for wear-test evidence in the actual pressure, gas, humidity and duty cycle. Load and temperature ratings alone do not establish dry-running or vacuum suitability.

Packing and evidence

Does every export package need an ISPM 15 mark?

ISPM 15 addresses raw-wood packaging. Processed wood such as plywood is excluded by its scope. Confirm the actual packing material and destination requirements; this is not a graphite-part certification.

Which HS code and freight duration apply?

Have the destination broker classify the actual composition and use. Ask the forwarder for a dated lane-specific estimate including customs assumptions. This page does not assign a universal HS code or guaranteed transit duration.

Are the scenarios and cost model measured customer results?

No. Scenarios are hypothetical review exercises; the cost table lists inputs to collect. No customer operating hours, failure rate, certified laboratory result or savings percentage is claimed.

13. Send the brief and drawing for review

Copy your RFQ brief, add PDF/STEP drawings and identify the checks you need quoted. Request written confirmation of grade, deviations, inspection scope, qualification, delivery and packing.